The Escravos GTL project will convert more than 300 million cubic feet of natural gas a day to GTL diesel and GTL naphtha.
-
The Escravos gas-to-liquids project site has room for expansion if required. -
Escravos site prior to construction (sand base laid down). -
Africa has a large reserve of gas – 10.2 trillion cubic metres. -
The Escravos GTL project will convert more than 300 million cubic feet of... -
A schematic of the gas-to-liquids process.