The plant consists of four gas trains to process the gas - two for the sweet low sulphur Unayzah gas and two for the sour Khuff gas.
-
The Haradh natural gas and oil development consists of a gas plant and a... -
Some 87 wells feed into the Haradh gas plant. These are linked to the plant... -
The plant consists of four gas trains to process the gas - two for the sweet... -
Engineers inspecting valves at the Haradh natural gas and oil development. -
The Haradh Gas Plant has a design capacity to deliver 170,000bpd of... -
The GOSP features two condensate stabilisers and two sour water strippers to...