Haradh

Specifications - Haradh Natural Gas and Oil Development Project, Saudi Arabia


Key Data
ProjectHaradh Natural Gas and Oil Development Project
OperatorSaudi Aramco
Location280km SW of Dhahran
Total Cost$2bn
Delivery1.5 billion ft³/day of sales gas
Gas Oil Separation300,000bpd of Arabian Light crude
Gas Gathering130 million cubic feet
Delivery Capacity170,000bpd of condensate to Abqaiq
Wells87
ManifoldsHaradh manifold (12km from the gas plant); Waqr manifold (50km); Tinat manifold (44km)
LinesFive 20in and 30in gas transmission, 130km total length
Power13.8kV power lines and substations
Gas TrainsFour (two for the sweet low sulfur Unayzah gas and two for the sour Khuff gas)
Unayzah GasHaradh, Ghazal, Wudayhi, Waqr and Tinat fields
Khuff GasHaradh field
Process1.6 billion cubic feet a day of a combined raw feed, up to 90 metric tons per operating day of sulphur
The Main Plant100,000m³ of concrete, 22,000t of structural steel, 410,000 welded joints, 4,000km of cabling, 540km of plant piping, 1,400 items of engineered equipment, 750km of line piping ranging from 18in to 56in
Factilities32,000m² of office and workshop space, 1,000 men, airstrip, 2,500 telephone exchange lines, data networks for 470 users, ground-to-air radio, 306km of fibre-optics, five communications towers
Key Players
Gas Processing FacilitiesJGC (Japan)
Utilities and OffsitesTechnip (Italy)
Industrial Support FacilitiesSaudi Constructioneers
Permanent CommunicationsGeneral Dynamics
Downstream Gas Condensate PipelinesTechnip Saudi Arabia
Gas Gathering Manifolds and Transmission PipelinesSuedrohrbau
Hawiyah BSP and Haradh Substation WorkNational Contracting
Overhead Transmission LinesMEEDCo
Haradh Camp ConstructionJ&P Saudi Arabia
Site PreparationAl-Khodari


client logon
Home
Products & Services
Company A-Z
White Papers
Jobs & Careers
Press Releases
Advertise With Us
Events & Exhibitions
Newsletter
New On This Site
About Us
Atom FeedRSS Feed
What is RSS?