Qatif-Abu Sa’fah

Qatif Production

500,000bpd of Arabian light crude

Abu Sa'fah Production

300,000bpd of Arabian medium crude, 370 million standard cubic feet per day gas

Qatif Wells

151 producer, injector and water wells

Abu Sa'fah Wells

29 new offshore wells and 61 workovers

Main Contractors

Snamprogetti, Technip, National Petroleum Construction, Chicago Bridge and Iron, General Dynamics, Construction and Contracting Enterprise, Suedrohrbau

Qatif Structure

North and south domes

South Dome

200,000bpd crude

North Dome

300,000bpd

Qatif Area

10km x 50km (6.2 x 31 miles)

Qatif Reservoirs

7 oil-bearing reservoirs

Qatuf Reserves

8.4 billion barrels

Abu Sa'fah Area

10km x 19km (6.2 x 11 miles)

Abu Sa'fah Reserves

6.1 billion barrels

Development

3 gas-oil separation plants (GOSPs), 5 new offshore platforms, 34 drilling islands, 10 platform upgrades, 30 drilling islands, 450km of pipelines, 600km of fibre-optic cable

Total Project

1,000km in-plant piping, 2,700km electrical cable, 3,000km fibre-optic cable, electrical substation / transmission lines, 130,000m³ concrete, 57,000t structural steel / equipment, 12,000 workers

Berri Gas Plant Production

1,600t per day, rising to 3,300t per day