Medgaz Pipeline Project

Project Type

Natural gas pipeline

Location

Algeria - Spain

Start of Construction

March 2008

Investment

€900m

Steel Pipe Suppliers

Mitsui and Sumitomo

Compressor Suppliers

Rolls-Royce and Dresser-Rand

Subsea Installation Services

Saipem

Compressor Station Construction Contract

Técnicas Reunidas-Amec Spie consortium

FEED Study

Intec Engineering and Ramboll

Inspection and Certification Services

Lloyd's Register

Induction Power Modules Supplier

Radyne

Detailed Route Survey

Geoconsult

Valve Supplier

James Walker Iberica

Protective Coatings

Canusa-CPS

Marine Survey

C&C Technologies

Geo-Hazard Assessment

CSIC

Geotechnical Investigation

Fugro

Other Contractors

Snamprogetti, D'Appolonia and GAS

Length

210km

Diameter

24in

Capacity

8bcm/y

Maximum Water Depth

2,160m
Expand

Free download worth over $5000
Download our 2019 Technology, Media and Telecoms Predictions Report

Worth up to $5,850

In this report, we look at the 30 big tech themes for 2019, identifying winners and losers for each theme. This report will impact all industries helping:

  • CEOs/Senior Staff: in all industries understand the disruptive threats to their competitive landscape
  • Investors: Helps fund managers focus their time on the most interesting investment opportunities in global TM
Close