Total to buy Tullow’s Uganda licences for $575m
French energy firm Total has brokered a deal to acquire oil and gas...
Trending:
French energy firm Total has brokered a deal to acquire oil and gas...
Dana Gas and Crescent Petroleum have resumed the expansion project at the Khor Mor field in the Kurdistan Region of Iraq (KRI), which was halted due to the Covid-19 crisis.
The Department of Energy (DOE) in the Philippines has approved Vires Energy’s (VEC) notice to proceed (NTP) application for the proposed integrated LNG project in the province of Batangas.
Engen, a unit of Malaysia’s Petroliam Nasional, is reportedly planning to convert the 120,000-barrel-a-day refinery in South Africa into a terminal in 2023.
Private equity firm American Industrial Partners (AIP) has agreed to acquire Ingersoll Rand’s majority interest in High Pressure Solutions (HPS) Segment for approximately $300m.
Saudi Aramco President & CEO Amin H. Nasser today attended the Saudi - Russian CEO Forum hosted in Riyadh as part of the state visit of the Russian President Vladimir Putin. At the Forum, Nasser noted the growing importance of Saudi Aramco’s evolving strategic relationship with Russian companies.
TMR™ N2 systems produce ≥97% N2 gas that is extremely dry (-67.8°C/-90°F dew point and <0.01% relative humidity) using a small amount of standard compressed air at ambient conditions (24˚C/75˚F).
Oxidation begins the very first day a lubricant is put into service. The oxidation process creates a dissolved breakdown product, or varnish precursor, that will accumulate in the oil over time until it becomes saturated. Once a saturation point is achieved, these varnish precursors physically convert from the dissolved form into solid deposits.
Does the system work during normal turbine operation when the varnish is dissolved in the oil?
Oxidation begins the very first day a lubricant is put into service. The oxidation process creates a dissolved breakdown product, or varnish precursor, that will accumulate in the oil over time until it becomes saturated. Once a saturation point is achieved, these varnish precursors physically convert from the dissolved form into solid deposits.
Hengyi Petrochemical reportedly planned to spend $13.65bn to build the second phase of a refinery and petrochemical complex in Brunei and US-based private equity firm Blackstone Group completed the sale of its 42% stake in Cheniere Energy Partners to Brookfield Infrastructure and funds managed by Blackstone Infrastructure Partners. Hydrocarbons-technology.com wraps up top new stories for September 2020.
Offshore Technology Focus is the essential reading material for decision-makers in the oil & gas industry, bringing you the latest news and analysis in an exciting, interactive format.