X

Nong Fab LNG Receiving Terminal

The Nong Fab LNG terminal will have re-gasification capacity of 7.5 million tonnes (Mt) a year. Credit: Dave Crosby.



  • Nong Fab LNG terminal
  • Nong Fab LNG terminal
  • Nong Fab LNG terminal
Close