Coker 8-3 vessel.
-
Aerial view of construction site (units 18-2 to 9-4). -
Coker under construction. -
Coker 8-3 vessel. -
View of pipe racks from 8-3 elevator. -
Upgrader expansion (UE-1) and underground piping [right]. -
Pipe rack module lift [left] deaerator module lift [right]. -
The mining process. -
The synthetic crude produced at the Syncrude facility. -
The new UE-1 plant and DRU. -
Equipment for mining the oil sand.